The Aging Infrastructure, Pipeline Assessment, and Rehabilitation Specialist you need, today.
With 50+ years of engineering experience, over 1,000 miles of pipeline assessment completed,
& 500+ pipeline rehabilitation projects,
AMKA Services is your Arizona-based, travel-anywhere, Pipeline Assessment Specialist.
Our Products and Services
Products and services for both gravity and pressurized
water/wastewater systems.
water/wastewater systems.
Pipeline condition assessment
Pipeline rehabilitation
Automatic service shutoff valves
Pressure monitoring equipment and systems
Control valve assessment, maintenance, repair, and replacement
Leak detection products and services
Valve and hydrant maintenance & flow meter testing
Lead service line assessment
Internal joint seal installation
A Few Project Highlights
Month/Year: October 2023
Technology Applied: Hydratite Internal Joint Seal
Pipe Diameter: 54-inch
Pipe Length: Spot repair
Summary of Work: Client had a 54-inch influent pump station pipe penetration that had a hole from corrosion. After multiple attempts to rehab the pipe with epoxy, the mechanical joint seal with a stainless steel backer plate provided the solution the utility was looking for.
Technology Applied: Hydratite Internal Joint Seal
Pipe Diameter: 54-inch
Pipe Length: Spot repair
Summary of Work: Client had a 54-inch influent pump station pipe penetration that had a hole from corrosion. After multiple attempts to rehab the pipe with epoxy, the mechanical joint seal with a stainless steel backer plate provided the solution the utility was looking for.
Month/Year: October 2020 – April 2021
Technology Applied: Primus Line
Pipe Diameter: 6-inch
Pipe Length: 15,840-feet
Summary of Work: An existing 6-inch ductile iron pipe that conveyed waste activated sludge from a wastewater treatment plant to a diversion structure was deteriorating due to hydrogen sulfide. Because of the challenging geometry and need for limited access points, Primus Line was used for the 3-mile rehabilitation.
Technology Applied: Primus Line
Pipe Diameter: 6-inch
Pipe Length: 15,840-feet
Summary of Work: An existing 6-inch ductile iron pipe that conveyed waste activated sludge from a wastewater treatment plant to a diversion structure was deteriorating due to hydrogen sulfide. Because of the challenging geometry and need for limited access points, Primus Line was used for the 3-mile rehabilitation.